Tuesday 5 February 2013

DEADLINE 2 - PLANNING

The first deadline for research has now passed.
If you failed to meet this deadline, it will have been noted and marks may be deducted for time management (an assessment criterion). You MUST complete this task, even if you failed to meet the deadline.
Your next DEADLINE is for planning. Study the list of requirements to the blog for this deadline. You will not be permitted to start filming unless these are done!

Deadline Two – Pre-Production Planning

A completed storyboard for the entire opening (preferably having used ‘post it’s), including initial ideas about title placing. 
This needs to be made into an animatic of approximately the same length as the final film will be (shots to be timed carefully) with a voice-over explanation and embedded onto the blog.

Also: 
- a synopsis for the whole film narrative from which this will be the opening (about 100 words),
- the script for any dialogue,
- list of roles (see pre-production planning advice)
- images of locations and decisions about locations,                                   
- prop research and justification in terms of character and story
- health and safety, including risk assessments for filming and use of equipment.
- lighting decisions. 
Blog Heading “Pre-Production Planning”(clearly label which group member has taken responsibility for each of the various posts). 
Again, consider blog format – images, text, screen grabs, embedded video, hyperlinks, etc
If you want to film over half term, this needs to be handed in earlier in order that we can check it through and grant permission.

Deadline - Friday 15th February, midnight.

No comments:

Post a Comment